— El Dorado Hills, El Dorado County · PG&E

Solar + storage in
El Dorado Hills, CA.

El Dorado Hills homeowners face the full force of Northern California’s energy challenge — high PG&E bills, real PSPS risk, and significant wildfire exposure. Continuum builds systems that fight back on every front.

6.0

peak sun hours/day in El Dorado Hills

$260–$350

avg. monthly PG&E bill

HFTD

High Fire Threat District — max SGIP eligible

Free

assessment for El Dorado Hills homeowners

— Solar in El Dorado Hills —

What El Dorado Hills homeowners need to know.

El Dorado Hills is fully in PG&E territory and falls under California’s NEM 3.0 Net Billing Tariff for all new solar installations. The area’s location in PG&E’s High Fire Threat District makes battery storage both financially and practically essential.

 
01

Sun & production

El Dorado Hills is situated within PG&E’s High Fire Threat District, making local homeowners among the most likely to qualify for enhanced SGIP Equity Resiliency rebates — which can cover up to 100% of battery storage costs.

02

Your utility & rates

PG&E has implemented Public Safety Power Shutoffs in El Dorado County multiple times in recent years. For El Dorado Hills homeowners, battery backup isn’t a luxury — it’s a practical necessity for the safety and comfort of your family.

03

Local energy landscape

El Dorado Hills has some of the highest average residential electricity bills in the Sacramento metro area due to larger home sizes and significant summer cooling loads — making solar payback faster than average.

Fire zone alert: El Dorado Hills is designated a High Fire Threat District by PG&E. This makes local homeowners among the strongest candidates for SGIP Equity Resiliency rebates — potentially covering 100% of battery storage costs. . Ask Continuum about your eligibility in your free assessment.

— Why Continuum in El Dorado Hills —

Local expertise. No shortcuts. No subcontractors.

Continuum isn’t a national company treating El Dorado Hills as a distant market. We’re a Northern California solar company — and El Dorado County is our backyard. Here’s what that means for your installation:

Local advantage 01

Fire zone specialists

El Dorado Hills sits squarely in PSPS-prone PG&E territory. We configure every system for maximum outage resilience — full home islanding, properly sized battery banks for multi-day coverage, and smart load management for extended backup duration.

Local advantage 02

Maximum SGIP rebate capture

El Dorado Hills homeowners have strong SGIP eligibility. We assess every customer’s Equity Resiliency qualification, handle all documentation, and make sure you receive the highest rebate tier you qualify for before you spend a dollar.

Local advantage 03

Large home system expertise

El Dorado Hills homes tend to be larger with 3,000–5,000+ sq ft floor plans and significant HVAC loads. We design systems for these realities — often recommending larger arrays and multi-battery configurations to properly offset actual consumption.

Our commitment

In-house crews only

Every Continuum installation in El Dorado Hills is done by our own trained technicians — never a third-party subcontractor. That means quality control from design through activation, and a team that stands behind their work long after installation day.

The Continuum difference: We’ve installed thousands of solar systems across Northern California. We know El Dorado County’s permit requirements, PG&E’s interconnection process, and the specific energy challenges El Dorado Hills homeowners face. That local knowledge translates directly into faster installations and better-designed systems.

— How it works —

From your first call to full power — our process.

Every Continuum installation in El Dorado Hills follows the same rigorous process. One team, start to finish. No dropped handoffs, no surprises.

  • Free El Dorado Hills assessment

    We analyze your PG&E bills, home energy profile, roof orientation, and SGIP fire zone eligibility. We design a system specifically for your home — not a generic package. No cost, no obligation.

  • Permits & SGIP application

    Continuum handles every El Dorado County permit, PG&E interconnection document, and SGIP rebate application. We know El Dorado Hills's specific requirements and submit accurate applications that don't stall your project.

  • Professional installation

    Our in-house crews handle everything: equipment, electrical work, panel mounting, battery installation, transfer switching, and system configuration. No subcontractors. Fully trained technicians on every job.

  • Activation & TOU programming

    We commission your system, configure TOU scheduling for PG&E's rate structure, and walk you through the monitoring app. You leave the first day knowing exactly how your system works.

  • Ongoing local support

    We're down the street, not across the country. Warranty service, system checkups, and support are handled by the same local team that installed your system.

— Also serving nearby —

We cover all of El Dorado County and beyond.

Continuum installs solar and battery storage systems throughout the communities surrounding El Dorado Hills. If you’re a neighbor, we serve you too:

Or explore our full service area — Continuum covers 13 Northern California counties from Sacramento to Redding, Napa to the Sierra Foothills.